HOCHTIEF Engineering GmbH · Project Example
Country | Peru |
Completion | 2013 |
The Cheves hydroelectric power station is being built in the Peruvian Andes at a height of 2,000 meters. In addition to the underground power plant, the HOCHTIEF Solutions contract includes building 17 kilometers of tunnel, two weirs, and a dam. The 168-megawatt plant is designed to generate enough energy to cover the maximum requirements in the Lima area after handover in late 2013.
HOCHTIEF Solutions AG Sucursal del Perú
Av. Camino Real 390, Of. 801
San Isidro, Lima • Peru
Tel: +511 208 8100
Fax.:
handersson@cch.com.pl
http://www.hochtief-solutions.de
HOCHTIEF Engineering GmbH
Consult Infrastructure
Alfredstraße 236
45133 Essen • Deutschland
Tel: +49 201 824-2741
Fax.: +49 201 824-2742
www.hochtief-engineering.de