Lösungen
Projects Segment index
  • HOCHTIEF Solutions
  • ·

Power plants · Project Example

Newhaven energy recovery facility

City New Haven
Country United Kingdom
Completion 2012

Several HOCHTIEF units collaborated to build a waste incinerator in southeast England. It generates electricity for some 16,000 households from 210,000 metric tons of domestic waste each year. Besides developing the plant’s design, we served as the general contractor for the construction pit, earthwork operations, shell and interior work, facade, heating system, air conditioning, and ventilation. Our engineering units also developed a special construction process to minimize the impact on groundwater levels, and managed the entire design and approval process. The plant officially commenced operations in mid-2012.

Copyright © HOCHTIEF UK/Ackermann

HOCHTIEF Engineering GmbH
Consult Building
Alfredstraße 236
45133 Essen • Germany
Tel: +49 201 824-8281
Fax.: +49 201 824-8556

www.hochtief-engineering.de

HOCHTIEF (UK) Construction Ltd.
Whitehill House Windmill Hill Business Park, Whitehill Way
SN5 6PE Epsilon • Great Britain
Tel: +44 1793 755555
Fax.: +44 1793 755556
uk@hochtief.de
www.hochtief.co.uk

 

other projects in segment Power plants
Poznan energy-from-waste facility

Poznan energy-from-waste facility • Posen• Poland

Walsum power plant

Walsum power plant • Duisburg• Germany

Cheves hydroelectric power station

Cheves hydroelectric power station • Peru